3arrow.GIF (843 bytes)Home
  3arrow.GIF (843 bytes)Doors
  3arrow.GIF (843 bytes)Specs
  3arrow.GIF (843 bytes)Tech
  3arrow.GIF (843 bytes)Contact Us 
1ptrans.gif (44 bytes)
Install Step 1
Install Step 2
Install Step 3
Install Step 4

Door Installation Step 1

Doorway Preparation

1.1 Check jamb and header for plumb, level and square
1.2 Snap a chalk line to indicate center plumb line on jamb
1.3 With top of the upper mounting bracket butting against the header, line up the center line on the bottom of the bracket with the jamb centerline. Use the bracket as a template to mark the hole location on the lamb and under the header if applicable. Center punch the holes.
1.4 With the jamb guard resting against the floor, line up the centerline on the top of the guard with the jamb centerline. Use the jamb guard as a template to mark the hole locations on the jamb. Center punch the holes.
1.5 Using #7 drill bit, drill pilot holes on centers in jamb (and header if applicable) to accommodate self-tapping bolts or lag screws. Then secure bracket to jamb appropriate fasteners - wood lag or self-tapping.

 

Next Step 23arrow.gif (108 bytes)

StoreFront Main Menu  

Home ] Up ]
Send mail to webmaster@rubbair.com with questions or comments about this web site.
Copyright © 1999 RubbAir Door, Inc.
Last modified: June 23, 2004
logobottom.GIF (7021 bytes)